Skip to product information
1 of 1

Traffic light control

Regular price €8,90 EUR
Regular price Sale price €8,90 EUR
Sale Sold out
Description

This program represents a complete traffic light control system for two directions (north-south and east-west). Pedestrian requests for both directions are also integrated. An emergency stop ensures switching to the safe "All Red" state.

Available both as an SCL block and as an FUP variant for easy integration into different programming styles.

Note: All modules serve solely as a learning and optimization basis and are not approved for live operation. Plant modules, in particular, must be reviewed and approved by qualified personnel before productive use.

How it works

The traffic light phases follow the classic sequence: red → yellow → green → yellow → red . Depending on the request from pedestrians or detectors, the corresponding phases are activated automatically.

A clearly defined procedure is stored in the code for each situation. Pedestrians receive a separate, safe green phase—while all other signals remain red.

When the emergency stop is activated, the control immediately switches back to the safe basic state “All Red” .

Technical details
  • Programming languages: SCL and FUP (optional)
  • Platform: Siemens TIA Portal version V13 or higher (recommended: V16 or higher)
  • Controllers: Compatible with S7-1200 and S7-1500
  • Timer: All traffic light and pedestrian phases (green, yellow, red) with IEC-compliant TIMERS
  • Double output: Control of two traffic lights in parallel possible (e.g. real and model display)
  • Structure: Modular structure, commented source code, easily extensible
Possible applications
  • Model systems and training systems
  • Traffic simulations (e.g. with PLCSIM)
  • Basis for real transport projects
  • Teaching materials in education and training

Thanks to a clear structure and available FUP alternatives, the project can be flexibly expanded or integrated into existing control systems.

compatibility
  • Siemens S7-1200 and S7-1500
  • TIA Portal version V13 or higher (recommended: V16+)
  • Fully testable with PLCSIM
  • Available as SCL and FUP module
Scope of delivery
  • Complete source code in editable format
  • SCL version and FUP module (optional)
  • All states, timers, inputs and outputs included
  • Commented structure for easy adaptation
  • Additional instructions available upon request

Delivery will be digital after purchase.

Support

I support you with:

  • Integration into existing projects or control architectures
  • Adjustment of phase times, states or logic
  • Extension to more complex traffic scenarios
  • Simulation and commissioning with PLCSIM

Support is available via email or shop message. Individual adjustments are available as customizations.